I got a little ahead of myself on those socks. The yarn is sportweight, and when I did a gauge swatch I got 6.5 sts/inch. Which would make an 80 stitch sock over 12" around. I looked at the specs for the fingering weight socks and recalculated for my gauge, and restarted with 64 stitches. A couple of hours worth of work:
Yes, that's a lot of ribbing. The Army's new socks are ribbed all the way down to the ankle, but it's much finer ribbing than this, so I don't think I want to do that. I'm going to try 6" of ribbing and 6" stockinette before I start the heel and see how that looks. I stuck a ruler down inside my husband's boots and got 8" - 9" from the bottom of the foot to the top of the boot, so this should give me smooth stockinette inside the boot, and maximize the amount ribbing above, which I hope will result in socks that stay up.
I have also been working on my Manos throw:
Finished block 6 and started block 7 yesterday.
Subscribe to:
Post Comments (Atom)
1 comment:
Great progress on both projects
Post a Comment